Sunday, November 1, 2009

Construction progress, November 1, 2009.





Yesterdays high was +18C (about 67F) so any sealant materials on the scow requiring final curing no doubt had their chance then. Perry is now well on his way installing the floatation foam. This very light white foam is exactly the same stuff used as packing material for stereo equipment, etc. It is also used for floating docks. The foam company erred a bit on the order making a bit more than we needed but making it in slightly smaller blocks than we wanted. So Perry is having to cut it up somewhat. Too much foam is a bonus as now we can fill the entire hull with foam and the top decking will hold it all down. You can see here how the foam stops about 3 inches (7.5 cm) below the top. The extra blocks can be cut into slabs 3 inches thick and placed atop the blocks of foam seen here.

Saturday, October 31, 2009

Construction progress, October 29, 2009.




The floatation foam was delivered on time and Perry has begun installing same. It is dark early in the evenings now and with Daylight Savings Time ending soon it will be darker even sooner. Perry has to work by floodlight. He had to cut the foam for the angled sections and it breaks apart easily into little crumbs which are full of static and stick to things such as the camera lens as seen here. A trip during daylight is scheduled for November 1st so better pictures will be available then. Very warm weekend + 17C on Saturday!

Wednesday, October 28, 2009

Construction progress, October 28, 2009.

Perry got the last of the internal waterproofing done last night so now we await the delivery of the foam.

Tuesday, October 27, 2009

Construction progress, October 27, 2009.

Last night Perry got the caulking all done on the inside seams. It was a relatively warm night and this was curing so well that he started the water sealing of the internal wood, and plans on having that finished tonight. The foam sections are to arrive at the scow's contruction site in a day or two, so Perry wants to be ready to install those.

Monday, October 26, 2009

Construction progress, October 26, 2009.



Today Perry began caulking the internal seams. He now has more water sealant to put on after the caulking has dried. We are starting to get close to the time when we will have to cease construction work, unless the weather holds. Plywood sheets here are just resting on the joists, they will be properly attached once the caulking, waterproofing, tiller supports and foam inserts are all done.

Friday, October 23, 2009

Scow update, October 22, 2009.

At a meeting last night, I got approval to buy the very bouyant but light rigid foam to put in the scow. Pieces will be preordered, cut to specification at the factory, and delivered. The foam will be about 10" thick, which is much higher than the waterline. Perry still needs to caulk all internal seams and waterseal the wood inside.

Wednesday, October 21, 2009

Construction progress, Oct. 20-21, 2009.

No progress has been made construction wise on the scow. The weather (and whole month for that matter) has been uncooperative with cold, rain, snow, sleet. Perry needs some warm, sunny, and dry days to apply water sealant to the inside of the scow and then caulk all the seams inside. Bolts to hold the four sections together have been ordered and we think we have a good lead on foam sheets to put inside each floatation chamber as an emergency backup system.