Construction progress, Oct. 20-21, 2009.

No progress has been made construction wise on the scow. The weather (and whole month for that matter) has been uncooperative with cold, rain, snow, sleet. Perry needs some warm, sunny, and dry days to apply water sealant to the inside of the scow and then caulk all the seams inside. Bolts to hold the four sections together have been ordered and we think we have a good lead on foam sheets to put inside each floatation chamber as an emergency backup system.