The floatation foam was delivered on time and Perry has begun installing same. It is dark early in the evenings now and with Daylight Savings Time ending soon it will be darker even sooner. Perry has to work by floodlight. He had to cut the foam for the angled sections and it breaks apart easily into little crumbs which are full of static and stick to things such as the camera lens as seen here. A trip during daylight is scheduled for November 1st so better pictures will be available then. Very warm weekend + 17C on Saturday!