Monday, September 7, 2009

Construction, September 7, 2009.



The first phase of construction is now completed. Now we need to find some water sealant which seems sold out or unavailable in Drumheller stores. Remember you are looking at the scow upside down. Building it this way reduces the number of times we have to flip the floatation boxes over and other logistical matters. The sections are now separated for painting of the water sealant. There may be no more construction pictures until such time that we find some water sealant. If so, I will post other historical pictures/comments or other aspects of the trip.

1 comment:

  1. The design is Ingenious for Water travel! :) Looking Good so far!! :)

    As for water sealant, would it be possible to order it on-line and have it mailed to you...though it may delay you a little bit? :? Without the Local Stores' stock of water sealant, I predict quite a conundrum. :?

    I wish you luck, sir!!

    ReplyDelete